Archive for October, 2011

Three Gorges power system dispatching and FM operation Abendkleider scheme of “acceptance by national electric power company

Monday, October 31st, 2011

2002, May 9 by the national electric power dispatching and communication centre for major scientific and technological projects of State power Corporation “regulation method and frequency modulation of three gorges power system study on the operational programme” adopted the project acceptance, presided over by the State electricity company. From the national power company, China Motor Engineering Society, China Institute of electric power, electric power planning and Design Institute, Tsinghua University, Huazhong University, the three gorges project Corporation, and North China, central China, East China, Northwest, southern, Sichuan, Chongqing, Jiangsu electric power company units made up of experts, such as acceptance of the expert group affirmed the results achieved by the project.
This project is a covers reservoir using, and grid run, and economic scheduling, more discipline, and more professional of comprehensive scientific research project, main including four aspects of research content: Three Gorges power system FM run programme research; Three Gorges power system large hydropower station group and three gorges joint run optimization compensation scheduling run way research; Three Gorges power system optimization harmonic adjusting peak way research and the three gorges power system early run way research.
after nearly three years of effort, project commitments at home and abroad and cooperation units through the integrated operation of the interconnected power system management experience, the use of advanced methods of calculation and analysis, presented in line with China’s national conditions and the law of power grid operation of three gorges power system dispatching and FM operation plan. A simulation study on AGC control, FM operation scheme for the three gorges power system digital simulation, validation scheme feasibility and rationality. Established has three gorges power system hydropower station group optimization scheduling database, development has optimization compensation scheduling calculation program; research in the first made has hydropower station group “power value maximum” of concept, and in hydropower station group joint optimization scheduling research found excellent process in the with of as stack generation convergence of discriminant value; and respectively to “generating capacity maximum” and Partykleid“power value maximum” for target established of mathematics model and calculation program, by simulation workers condition inspection, hydropower station group overall adjusting peak ability obvious improve. Project research has three gorges power system run early of security stability level, focus for 2003 and 2005 two level years system run of normal way, and overhaul way and special way, for has security stability analysis, made has three gorges power system put into production early security stability exists of main problems and run in the should control of important section of stability limit, its about conclusions for three gorges unit put into production Qian Sichuan electric East sent engineering and the 2002 of run way analysis provides has pursuant to ; System failures in the early production of the three gorges power system oscillation Center conducted a study of the case, raised inhibits oscillation expanded their course of action to avoid accidents, of the three gorges power system safe and stable operation of the early in the three gorges power generation has a strong guiding.
project for three Gorge power system operation needs, conducted in-depth research, overall study results on quality, three gorges power systems security and economy operation and national interconnected power grid interconnection line and frequency control has important role. Hydropower operation mode of the three gorges power system for the future arrangement has important guiding significance.

Xiaowan power station will be built “Abendkleid green power”

Monday, October 31st, 2011

20th start of xiaowan hydropower station construction site, accompanied by a bulldozer rumbling sound, workers are busily to save slag gravel waste land for the construction of transportation in the field. In xiaowan hydropower station construction site, amount of slag yard has 12, each residue field area has at least two football fields, total deposit slag amount to 20 million.  Keep built around slag residue field walls, drains, slope protection by slag surface to ensure waste residue after removal here no more losses, engineering end residue field to afforestation.  Xiaowan hydropower station Engineering Department projects engineer Zhou Hua said, “is now most of the residue field has been put into use, greatly reduces the power station in the construction of solid waste pollution.” Junction of xiaowan hydropower station in nanjian County, Yunnan province and Fengqing County middle reaches of the Lancang River, with capacity of 4.2 million-kilowatt, is the planned construction of middle and lower reaches of Lancang River cascade hydropower stations in eight of the leading power station. Calculation across soil-rock excavation of xiaowan project amount more than 30 million and part soil stone ballast to as project itself the source.  12 deposit of slag in construction site, more Cocktailkleid than 10-year construction period in the future can hold power station under construction waste generated in basic soil residues, waste soil residue does not guarantee that these lost to lower reaches of the Lancang River. Construction of the xiaowan hydropower project will implement stringent environmental measures, plans for ecological environment protection of power plant investment of 1. More than 2.5 billion yuan. Power station Engineering Department Deputy Director Yang Yafeng said “we to build a ecological xiaowan hydropower station power station, must enforce strict environmental standards it. “According to reports, the approaching roads repaired Engineering Department after the introduction of advanced machinery and lawn spraying technology, green on both sides of every highway subgrade slope.  Project upon completion, construction should all green or rehabilitation. Also, 3 construction projects and the construction of power plant sewage treatment system, every day daily treatment amounted to more than 45,000 cubic meters of sewage and construction engineering. No cleaning works and sewage, not allowed to directly into the Lancang River. Builders construction dust and noise, also will take the appropriate measures.

Generating capacity continues to increase in parts of power Partykleider shortage eased

Monday, October 31st, 2011

Sun Beijing May 27 (zxs) China National installed capacity increased, current power shortage situation has receded in parts.

the reporter learned from the national grid company, One of this year, when the national power generation capacity 647.3 billion-kilowatt, increase of 15.8% over the same period last year, when the State grid Corporation operating a regional electricity production 542 billion-kilowatt, increase of 16.3% over the same period last year.

in April, due particularly in southern regions of the country more rainfall, the major power plant reservoirs to water increasing, hydro increased electricity tensions had eased in some areas, Fujian did not switch out the energy this month, limit significantly reduced the number of Hunan, Sichuan, Chongqing, Shanghai, Zhejiang, Abendkleider Jiangsu and pull the energy volume has declined. But the impact due to inadequate coal supplies and generator maintenance, State grid system has 14 provincial power grid switch out the energy phenomena, with the advent of summer peak, the tensions in the power supply and demand will be more severe than last year.

according to the analysis, countries introduced in the near future against some sectors low-level duplicate construction, cancellation, higher power consumption electricity industry preferential electric energy price in a series of macroeconomic regulation and control measures to ease a part of the rapid growth of the industry, easing tensions in energy, raw material supply. These measures of implemented will will on mitigation power supply and demand tension situation produced of actively effect, but power supply and demand tension situation still will continued, as summer electricity peak of comes, pull brownouts of area also will increased, power gap will further expanded, grid safety situation will than Shang a years more grim, for this about sector is actively should welcomes peak crossing summer of the prepared work, to maximum to guarantee power effective supply, guarantee grid run security.

Hunan electricity arrears nearly 3 billion first in Abendkleider günstig the country by the end of June do not pay the exposure

Sunday, October 30th, 2011

Red NET Cheung Sha, May 21 (reporter Kuang Lifang) reporters learned from the working meeting held in Hunan electric power today, by the end of April, Hunan provincial power company system statistical data indicate that the company is owed huge amounts of electricity tariffs, together with other small water and electricity company, the province’s accumulated arrears amounted to $ 2.917 billion, ranks first in the country.

it is understood that since December last year, the provincial government to focus on organs and institutions owing money paid. From the current situation, the effect is not obvious. Ended late April the Province owed over $ 300,000 institutions owe fees totaling $ 23.15 million, representing settlement fell by only $ 8.31 million before action.

Zheng Maoqing Vice Governor of Hunan provincial people’s Government at the meeting stressed that Governments at all levels and relevant departments should further increase the intensity of paid work, implementation of measures to remain outstanding, owed by ensuring that electricity tariffs in cleared prior to the end of June. He said, Executive Office of the provincial Government will focus on tuition and units specialized in supervision and, when necessary, also will be on television, newspapers and other news media for tuition-areas and units for exposure.

industry pointed out that the huge electricity bill arrears, and the resulting power supply enterprises owed purchase electricity power generation enterprises, not only of normal production, operation and construction of electric power enterprise is seriously affected, but also seriously disrupted the normal order of market economy and affect the image of Hunan.

Zheng Maoqing requirements, Governments at all levels and departments concerned should adopt effective measures to urge consumers paying electric rate according to the law, supporting power companies charge according to the law, collection of electricity charges to create a good environment and power supply order. Tariff settlement accelerated power supply enterprise reforms of various users throughout the province gradually Cocktailkleid introduced “after first purchase”. To intensify the destitute and bankrupt enterprises in production and livelihood electricity isolation and transferred power to transform, and funds needed by the power companies, power companies and where the State Government in proportion with the share. To standardize the Corporate bankruptcies and restructuring. Strict implementation of the State economic and Trade Commission, the Central belongs to close bankrupt enterprises of resource-exhausted mine and the views of the relevant provisions of the transfer of power supply system: “bankruptcy bankruptcy during the tariff should be included in bankruptcy fees; bankruptcy following the end of the newly formed company tariffs should not be in arrears. Such as tuition, in principle, by the local Government to urge the power companies pay, enterprises cannot afford to pay and the local government is required power supply, be supplemented by the local government. “Reforming enterprise must bear the original company energy debt, local governments shall not be in violation of the regulations on enterprises owed as bad debts, or to take other forms of evading tariff debts. (Manuscript sources: Red net) (Author: Kuang Lifang) (Edit: Liu Jian)

CLP investment leaders to attend Shanghai power “big pressure on small saving” main equipment Abendkleider of project procurement contract signing ceremony

Sunday, October 30th, 2011

4 Abschlussballkleider 23rd Shanghai Electric Corporation and Shanghai Electric group at “big pressure on small saving” items (2X1000MW and the 2X300MW) main equipment purchase contract signing ceremony on. Hu Yanzhao, Vice Mayor of Shanghai, General Manager Wang Binghua, Vice General Manager Ding Zhongzhi and Shanghai municipal development and Reform Commission, the Commission and other relevant ministries and relevant units of the East China electricity regulatory Commission Board, for East China grid and attend the signing ceremony.

Wang Binghua made an important speech at the meeting. He pointed out: Shanghai electric power, Shanghai Electric group company limited sign “pressure on small, energy-saving emission reduction” project main equipment purchase contract, not only marks the Shanghai Electric “pressure on small, energy-saving emission reduction” has been started, at the same time also marks the China Power Investment Corporation and its affiliated enterprises are trying to practice the solemn commitments to the country. “Pressure on small, energy-saving emission reduction”, concerns national “Eleven-Five” planning the overall situation of energy saving and environmental protection objectives, also concerning the overall situation of enterprise’s sustainable development, responsibilities and arduous tasks. Under the strong leadership of the Shanghai Municipal Government, supported by the joint efforts of various sectors of the community and, Shanghai electric power “big pressure on small, energy-saving emission reduction” will certainly be able to smoothly, “Eleven-Five” energy saving and environmental protection goal can be achieved!

the signing of the “great pressure on small energy-saving emission reduction” program, 2X1000MW ultra-supercritical coal-fired units are Cao Jing in the first phase of the construction of the equipment, put into production in 2009 and 2010; 2X300MW subcritical coal-fired units are Wu Jing reformation of old equipment, 2010 commissioning.

these four units commissioning structure will improve the Shanghai power plant generator set, met Shanghai electricity demand and achieve the 2010 unit GDP energy consumption and emissions of main pollutants than 2005 target to decrease by about 20% and 10% respectively.

Held supervision Office of Changsha Partykleider electric network operation license for 2008 Conference

Saturday, October 29th, 2011

March 11 supervision Office 2008 in Changsha electric network operation license work Conference hold in Changsha, provincial electricity industry association and city (States) electric network operation license liaison (examination) heads and key staff stood more than 40 staffs attended the meeting. Nanjing electric power secondary systems safety supervision Office organizations specific checks

the meeting summed up work for 2007. It was noted that: 2007 is licensed in Hunan electric network work important year, in this year, has made breakthrough progress: one was the establishment of the Organization, and put the responsibilities; the second was the establishment of the management system, and put the program; three is to develop goals, completed the work. Conference in recognition of the Zhuzhou Electric Co, Chenzhou city commissions, Changsha electric power line in 2007 electrical network operation license 3 excellent unit of work outstanding, and issued a medal. By the end of December 2007, new evidence of the total 111,174 in Hunan province, and 5,063 registration renewal of an electrician. Electrical network work permits working in provincial cities (States) fully under way smoothly. Central China electricity regulatory Commission annual analysis of the electricity regulatory complaint information (2007)

2008 arrangement of the work of the Conference, put forward demands. At the same time on each point of contact registration plan was discussed and adopted. South electric prison Council held South regional power plant grid-connected security evaluation standard validation will

meeting requirements all contact points (examination points) to full awareness do electrician into network job license management work of important significance, set for people service of service consciousness, effectively specification electrician into network job license training, and examination work, strengthening on training examination and the continued period registered work of organization leadership, efforts do electrician into network job license work. Northeast electricity regulatory Commission set off upsurge of learning the Government work report on how to license

3 outstanding units made a typical statement, delegates took the floor, Abschlussballkleid for electrical network work permits contribute ideas, exchange of experience. Meeting achieved the expected results, short, pragmatic and efficient.

Development and Reform Commission on rural power networks conducted a Abschlussballkleider special audit of Zhejiang Province

Saturday, October 29th, 2011

Random check equipment of substation, the field measuring 10,000 volt line span, check in reconstruction of the old and the new poles, on-site inventory of household metering, visited farmers understand the situation before and after alteration of power NET in power. Mission for the national development and Reform Commission national key construction projects inspection group, June 9 on rural power network reforming project in Zhejiang Dongyang special inspection. Audit Group fully endorsed Dongyang rural network reconstruction project “actually.”

reportedly, entrusted by the State Council, in line with the acceptance of rural power grid construction and transformation projects, national development and Reform Commission inspection Office sent an inspection group on rural power network reforming project conducted a special audit of Zhejiang Province, Dongyang city, Zhejiang Province, but one by one the County (City) accepted the focused inspection.

inspection group in heard has Jinhua Electric Industry Council, and Dongyang power supply Bureau agricultural network reconstruction of work reported Hou, inspection has Shang thousands archives information, from may research plans approval to item engineering of design, and budget, and settlement, and acceptance and completed accounts, from agricultural network reconstruction of project funds approval to related of accounting statements and accounting voucher, are for seriously of check, while on participation agricultural network reconstruction of about management personnel, and technicians and grass-roots construction personnel for has large asks.

after 8 days of inspection, inspection group on rural power grid construction and transformation projects in Dongyang city, gave a full affirmation. On the feedback, check group believes that it can be concluded that a basic conclusion, Dongyang is real rural power grid construction and transformation projects. Dongyang agricultural network reconstruction of engineering volume and completed accounts of content match, engineering cost reasonable, engineering planning science, reconstruction planning meet 5-10 years rural economic development requirements; device selection advanced, main knot line reasonable, distribution variable placed load Center; engineering financial accounting specification, funds management strictly, archives information complete, seriously implementation has first responsibility people requirements; reconstruction effect obvious, reached has national expected of purpose.
Cocktailkleider in, hope to strengthen communication up and down, power grids in the future bidding work of engineering design in a more granular, more standardized.

Shanxi province to build a Cocktailkleider wind farm

Friday, October 28th, 2011

Our province is to build wind power for energy power projects, preparatory work has been fully started, provincial development and Reform Commission yesterday to make arrangements.

known as “blue sky and white coal” of wind resources, is an inexhaustible and don’t pollute renewable. Wind power is the use of natural wind, generate electricity by magnetic lines are cut. This is the largest prospect development and commercialization of one of the modern generation, in terms of reducing energy consumption, reducing pollution has a clear role. According to reports, China’s wind-rich, installed capacity in the development of the highest in the world. China wind power installed capacity was only 460,000-kilowatt, national electricity share of the total installed capacity of less than 1%, enormous potential for wind power in China. Countries have been initially identified, in recent years the construction of four 20 or above large-scale wind farm, by 2020, formed 20 million-kilowatt in the country’s power generation capacity.

two years early in my province meteorological evaluation of wind energy resources, initially identified as Datong, Shuozhou, Xinzhou city, luliang, and other parts of the city with a certain degree of power generation such as wind, wind speed conditions, General construction scale of each wind farm proposed for 5 per cent. Accordingly, meteorological evaluation of wind energy, our province has now started planning and site selection of wind farm in preparation, according to requirements of plan will be completed during the year, next year “Eleven-Ballkleid Five” plan started, one after another under construction. Provincial development and Reform Commission has arranged $ 1 million power Fund for preliminary work on the construction of these projects.

according to rough estimates of experts, and built several wind farms, forming 500,000-kilowatt capacity, more traditional thermal power plants, annual savings of six hundred thousand or seven hundred thousand tons of coal-fired, with significant economic and social benefits.

Breeze good sailing all the way–in North China Cocktailkleid power grid to build electric energy trading platform

Friday, October 28th, 2011

Zu Min

as the power market reform is deepening, how to make full use of market instruments, activist spanned across provincial electricity trading, optimizing the allocation of resources, promote the development of regional economy and society, as right in front of electric power enterprise “solution of equation”. This year, the North China grid company limited made the cross-step, gives this “solution of equation” a nice answer.

on December 20 last year, North China electric power dispatching (Exchange)Abendkleider Center officially, formerly “North China electric power dispatching Bureau” hence the appellation from the historical stage. Detailed criticism both before and after titles of distinction, core landed on the “deal” on the word. If the literal difference is merely a symptom, the institution that is hosted behind the function adjustment of the substance. It is understood that changed its name before the scheduling Board imposed on the North China power grid dispatching management, in accordance with the principle of unified scheduling, grade management, organizing, directing, guiding and coordinating the North China power grid safe, stable, high quality and economical operation. Changed its name to dispatch (Exchange) Centre, it also hosts a involved in cultivation in North China electric power market, promoting province and North China power network in North China power grid and other functions of the electric power and energy transactions between regional power grid. Scheduling (Exchange) Center was established electricity market operation, better regional power resource optimal allocation in paving a smooth sailing.

launch platform: market access to

power leveling most of the past by telephone or by facsimile, time-poor scheme color consistency. Province in North China power network electric energy trading platform adds many new features – quote, fix calculation, tie-line plan adjustment, trading, settlement and information publishing. This platform to conduct annual and monthly and and recently real-time transactions, meet power transactions between North China grid rule requirements. And in the course of trading, through the operation of the market, give full play to the existing capacities of generation and transmission facilities, protection of both supply and demand reasonable return. This has eased tensions in the power situation, reduces the switch out the energy, optimizing the allocation of resources.

3 earlier this month, spring irrigation of Hebei South network load a sudden surge in tension power supply, power generation output a serious shortage of daily peak electricity shortfall amounted to 1 million-kilowatt, near one-tenth of Hebei South network load. In this case, companies taking advantage of the large power grids of North China, the use of spinning reserve capacity of the North China power grid, active power transactions between provinces, timely organization of power support, Hebei province electric power company on March 16 by Beijing-Tianjin-Tangshan power network temporary electricity 400,000-kilowatt, successfully contributed to the province between the electric energy trading platform since the start of trading for the first time.

promulgate rules: standard thinning market transaction

is a gradual power trading market cultivation and development process, cannot accomplish. In particular with regard to all market players involved the operation of the market should have an adaptation period. No rule buchengfangyuan. Market trading rules is to ensure that trading activities in an orderly manner, markets key to the effective operation of the trading system.

as the electrical energy trading platform between provinces started, company and the promulgation and implementation of the North China power grid in North China province electricity trading regulations (hereinafter referred to as the rules). On the rules of provincial power various types of transactions between specific operational processes, transactions, obligations of the parties, as well as their time expressly provided. At the same time, to strictly regulate the electric energy transaction process, has a very strong guiding and operability. After the promulgation of the rules, was launched in North China power network monthly centralized broker transactions between provinces, 14 March completed temporary power transactions, transactions when the charge reaches 47.4 million-kilowatt. Among them, recent transactions 8, live trading 6, including 13 in Hebei South network transactions, transactions when the power 43.7 million-kilowatt, maximum increased for the power of 1 million-kilowatt; and in Shanxi power grid deal 1, when volumes 100,000-kilowatt.

rules under and province between power trading platform of “close” combination, conducive to on real-time run way and power planning for in-depth research; conducive to construction scheduling and market, and security and economic of harmonious, more full to reflected “three public” scheduling principles, improve has grid across province transmission ability; conducive to optimization configuration power and grid two large resources, reduced has pull road brownouts loss, made has social benefit and economic benefits of double harvest.

Electricity regulatory Commission of the South Board operations Cocktailkleid in Guangzhou officially

Friday, October 28th, 2011

Follow deployment of national electricity regulatory Commission, positively and steadily promote electric power market reform, after half time preparations, State power Regulatory Commission the South Bureau (“Southern electric administration”) in Guangzhou on December 16 operation formally. This indicates that China Southern power market and market-oriented reform of the regulatory system will take substantive steps.Cocktailkleid

southern China electricity regulatory Commission Council is the local offices of the State electricity regulatory Commission, implementation of power executive law enforcement functions of the institution by the State electricity regulatory Commission administration should. Electricity regulatory Commission, in charge of southern region of southern China including Guangdong, Guangxi, Hainan, Yunnan, Guizhou province 5 provinces electricity regulatory work. Its main functions is: regulatory South regional power market operation, specification power market behavior, maintenance fair competition; regulatory area within power enterprise and power scheduling trading institutions; is responsible for area within power administrative law enforcement, and administrative punishment and administrative litigation, about legal Affairs; is responsible for area within power security and reliability regulatory; is responsible for area within power market statistics and information publishing; management area within power business license; according to law investigated and dealt with area within power Enterprise illegal violations behavior.

southern China electricity regulatory Commission Secretary Yang kun said at the ceremony, covering the 5 provinces and autonomous regions of China Southern power grid, power supply 1 million square kilometers, power service population of around 220 million. Cross-provincial electricity trading since 1993, when the cumulative volumes until the end of 2003 amounted to 103.1 billion-kilowatt. But changes with economic developments and market main body, existing resource allocation means and mechanisms adaptable to needs for power development urgently needs structural reform and mechanism innovation. Southern electricity regulatory Commission, the establishment of the South regional power industry development and market-oriented reform of objective needs.

compared with other regions, southern region electric power industry and power market has its own particularities. First, the Eastern Province (area) of demand load imbalance caused huge economic gap. Second, resource distribution is unbalanced, rich water, thermal power resources in Western, East lack resources. Third, the structure and technology of China Southern power grid is a very complex network, span, from West to East, large capacity, distance, ultra high voltage AC and DC stator connections run power network stability problems.

for this, South electric prison will will from South area of features set off, full consider all province (area) economic development level, and electric price level differences larger of reality, in accordance with the “open up enterprising, rigorous pragmatic, just law enforcement, honest and clean” of requirements, firmly set according to law regulatory of concept, efforts established and maintenance fair, and just of market order, actively maintenance power system security stability run, promoting South regional resources of optimization configuration. Reporter Lai Jidan (source: people’s daily · South China News)

links: Administration take up the monitoring responsibility of the South